Projects - During and Completed images

Orangery Maids Morton

Orangery room built on the side of a manor house

Wall's starting to go up

Roof structure for Lantern from above

Roof structure for Lantern from below

Lantern ready for installation

Lantern for the Orangery roof

Lantern installed

Side view ready for windows

Window's, plastering, decorating finished.

Flooring being laid

Patio doors looking onto back garden

Garden Room/Office

cant extend onto your property, why not build at the bottom of your garden,

Garden Room/Office

Project, Part way built on site, showing slate roof and Marley Maintenace free cladding boards

Garden Room/Office

Internal View completed,

Velux roof Windows installed to allow sun entry,

Garden Room/Office

wiring, including telephone line, Network connection and alarm system all routed through to the existing property,

Garden Room/Office

Completely insulated and heated, useable all year round,

Prices vary from £13'000 through to the example shown at £19'500

Floor Tiling with "Warm-Up" under floor heating,

Floor primed ready for heating elements to be laid,

Floor Tiling with "Warm-Up" under floor heating

Part way through the Installation with the elements in-place and tested,

Floor Tiling with "Warm-Up" under floor heating,

Floor ready for grouting

Floor Tiling with "Warm-Up" under floor heating,

Kitchen Installed and project fully completed by Masom'S

Kitchen Refurbishment in Newport Pagnell

Day Three,

Kitchen out - wall removed with New oppening made and plastered, all within Local Building Control,

Kitchen Refurbishment in Newport Pagnell

Day five,

Kitchen re-wired & cabinet installation under-way,

Kitchen Refurbishment in Newport Pagnell

Day seven,

Installtion nearing completion, Solid Oak tops in place and treated, appliances ready for installtion,

Kitchen Refurbishment in Newport Pagnell

Day nine,

Kitchen completed and hand over time to customer,

completed on time, within budget and to Masom's High Standards

1st Floor Balcony

1st Floor Rooms with a view

1st Floor Balcony

Handrail assembled, ready for final preperation and staining

1st Floor Balcony

Image showing existing Balcony removed, ready for new Be-spoke balcony,

1st Floor Balcony

Specially constructed Parts pre-stained and finished prior to on-site fitting,

1st Floor Balcony

Balcony Platform in place ready for Handrail fitting

1st Floor Balcony

parts placed ready for securing,

1st Floor Balcony

completed Balcony,

1st Floor Balcony